Since Q4 2024, building materials are up 11.7% and construction wages 8.0% (BLS, to September 2026), about 9.9% blended. NAHB published its last survey on January 20, 2025 and hasn't announced the next; on its two-year cycle we expect it in early 2027.
Finish level
The NAHB average home: mid-range cabinets, quartz, LVP, vinyl windows. Changes cabinets, counters, flooring, siding, roofing, windows, doors, appliances, fixtures and the driveway only.
Area unit
Number of stories
Leave at 0 if you're your own contractor. NAHB 2024: overhead and profit equal about 26% of construction cost.
0%Applied to building costs, not land25%
More options: base rate, lot coverage, story adjustment
NAHB 2024 national average, construction only ($162/sq ft). The cost data and finish level above adjust this rate.
State (label for your printout)
NAHB doesn't publish state figures, so this doesn't change the estimate.
From your local zoning code.
NAHB doesn't publish costs by story count. Enter your builder's quoted difference (+ or −).
Use your own quotes (optional)
Each row uses the NAHB national average until you enter a rate per sq ft or a lump-sum quote. A stage quote replaces all of its sub-items.
These figures start from national averages in the NAHB 2024 Cost of Constructing a Home survey and are not a quote for a specific house or location. This estimate uses NAHB 2024 national averages, standard finishes; your own local quotes are always more accurate. NAHB does not publish separate costs for single-story and multi-story homes. Contingency is applied to building costs (construction, story adjustment, overhead and profit), not to the land price.
Saved in your browserSwap in your own quotesExport a PDF checklist
How it works
From a national average to your own number.
01
Pick a starting point
Enter the house size you have in mind to see the cost, or enter your budget to see how big a house it can build.
02
Start from real averages
Every estimate starts from the NAHB 2024 survey, split into the 8 stages builders use, from site work to final steps.
03
Make it yours
Replace any stage or line item with a contractor quote, then add land, overhead and a contingency.
Where the sales price of a new home goes (NAHB 2024)
Construction 64.4%
Finished lot 13.7%
Builder profit 11%
Overhead 5.7%
Other 5.2%
Your own cost depends on where you build, the design, the finishes and current local prices. Building material costs rose 6.7% over the 12 months to July 2026, according to the NAHB/Wells Fargo Housing Market Index (July 2026). The calculator lets you use NAHB 2024 as published, add an inflation adjustment, or switch to our 2026 line-by-line update, and replace any line with your own quote.
Cost to build a house per square foot
Included in $162/sq ft
The physical construction of the home
NAHB's site work stage: building permit, impact, water and sewer fees
Architecture and engineering
Not included
The land
Builder overhead and profit
Construction loan interest
Soft costs such as insurance and temporary housing
A simple rectangular plan costs less per square foot than multiple roof lines, bump-outs or complex angles. When comparing builder quotes, confirm exactly what each price per square foot includes: some builders include landscaping, the driveway or appliances, and others don't.
New home construction costs breakdown: the 8 stages
NAHB splits construction into eight stages, shown as a share of total construction cost. These shares drive the calculator's estimates.
Interior finishes are the largest stage at 24.1%, which is why flooring, cabinets and fixtures move the total so much. Major systems rough-ins come second at 19.2% and don't scale down much with a simpler design.
1,500 and 2,000 sq ft house build cost examples
Stage
Share
1,500 sq ft
2,000 sq ft
I. Site Work
7.6%
$18,468
$24,624
II. Foundations
10.5%
$25,515
$34,020
III. Framing
16.6%
$40,338
$53,784
IV. Exterior Finishes
13.4%
$32,562
$43,416
V. Major Systems Rough-Ins
19.2%
$46,656
$62,208
VI. Interior Finishes
24.1%
$58,563
$78,084
VII. Final Steps
6.5%
$15,795
$21,060
VIII. Other
2.1%
$5,103
$6,804
Construction total
100%
$243,000
$324,000
Example only, at the NAHB 2024 national average of $162/sq ft. Includes NAHB's site work stage. Excludes land, builder overhead and profit, contingency and soft costs.
How big a house can I build with my budget?
The I have a budget tab works backwards. Example: a $500,000 budget, $80,000 land, 10% contingency and about 26% builder overhead and profit (NAHB's 5.7% overhead and 11.0% profit of the sales price, as a markup on construction cost).
Total budget$500,000
Less land$420,000
÷ 1.10 contingency$381,818
÷ 1.26 overhead & profit$303,030
÷ $162 per sq ft≈ 1,871 sq ft
That is about 1,871 sq ft on one floor or about 935 sq ft per floor on two. Acting as your own general contractor? Set overhead and profit to 0% and the same budget stretches further.
Before you budget
Single vs two-story
Two stories share one foundation and one roof, which can lower the cost per square foot. Stairs, stronger floor framing, scaffolding and longer plumbing and HVAC runs add some back. NAHB doesn't publish costs by story count, so enter your builder's quoted difference in the story adjustment field.
Get written quotes from at least three contractors for each major stage, all pricing the same plans, finishes and site. Ask for a breakdown by stage: a stage far below the national share may mean scope has been left out or cheaper materials are planned.
Building adds land, site work, utility connections, soft costs, loan interest, temporary housing and your time. Buying adds closing costs and any repairs. Which wins depends on your local market, so compare real builder quotes with current listings.
A construction loan pays out in stages called draws, each released after an inspector confirms the stage is done. You usually pay interest only on what has been drawn. At completion it is paid off with a mortgage or converts to one (a construction-to-permanent, or single-close, loan).
Lot purchase
Foundation
Framing
Rough-ins
Drywall
Final
Milestones vary by lender. Check the draw schedule before you start so each contractor can be paid from the right draw. Construction loans explained
According to the NAHB 2024 Cost of Constructing a Home survey, the average construction cost for a new single-family home was $428,215, or about $162 per square foot, for an average finished area of 2,647 sq ft. This is the construction cost only and does not include the lot, builder profit, or overhead. Total sales price averages higher: construction accounts for 64.4% of the average sales price, with the finished lot at 13.7%, builder profit at 11.0%, and overhead at 5.7%. Costs vary significantly by location, design complexity, and material choices, so use local contractor quotes for the most accurate estimate for your project.
The NAHB 2024 survey reports an average construction cost of approximately $162 per square foot for new single-family homes. This figure covers construction only. It includes NAHB's site work stage (average permit, impact, water and sewer fees, and architecture and engineering) but excludes the land and the builder's overhead and profit. The actual cost per square foot for your project will depend on your location, the complexity of the design, the finishes you choose, and current local labor and material prices. Building material costs have continued to rise since the 2024 survey data was collected.
Using the NAHB 2024 national average of $162 per sq ft, the construction cost for a 2,000 sq ft home would be approximately $324,000. NAHB reports builder overhead (5.7%) and profit (11.0%) as shares of the sales price; as a markup on construction cost they come to about 26%, which brings the total to roughly $408,000 before land. NAHB's construction figure already includes average permit, impact and utility fees. With a 10% contingency and a land cost that varies widely by location, total project costs will be higher. These are illustrative figures based on national averages; real costs depend on your location, design, and builder.
It depends on your market and what you compare. Building gives you a new home tailored to your needs, but the total project cost (land, construction, permits, fees, loan interest during the build, and temporary housing) often exceeds the price of a comparable existing home in the same area. In some markets with low land costs and high existing home prices, building can be competitive. The best approach is to get local builder quotes and compare them to current listings for similar-sized homes in your target area.
A builder's quoted price per square foot typically covers construction only. It usually excludes: the land, architectural and engineering fees, building permits and impact fees, utility connection and tap fees, site work (grading, clearing, utilities to the lot), landscaping and driveway, construction loan interest, property taxes during the build, builder's risk insurance, and the cost of temporary housing. Always ask your builder for a written list of what is and is not included in their price.
The most commonly overlooked costs include: impact fees (which can be thousands of dollars per lot), utility extension costs if the lot is not already served, construction loan interest over the build period, property taxes on the land during construction, temporary housing while you wait to move in, architect and engineering fees, plan review fees, as-built surveys, and the certificate of occupancy. The land-to-move-in checklist on this page lists all 18 phases of costs to help you avoid surprises.
Most construction advisors recommend 10 to 20% of the total construction budget as a contingency reserve. The lower end (10%) is suitable if you are working with an experienced builder on a straightforward design and have detailed quotes. The higher end (15 to 20%) is more appropriate for custom or complex designs, rural lots with uncertain site conditions, or if you are acting as your own general contractor. The calculator defaults to 10% but you can adjust the slider to match your risk tolerance.
Land clearing and site preparation costs vary widely depending on the lot size, the amount of vegetation, the terrain, and local labor rates. Costs depend on whether you need tree removal, stump grinding, grading, fill dirt, erosion control, and a temporary construction entrance. Rather than quoting a number that may not apply to your lot, we recommend getting quotes from local excavating contractors after your boundary and topographic surveys are complete.
At minimum, you will need a building permit from your local jurisdiction. Depending on your location and project, you may also need: a plan review fee, impact fees, water and sewer tap fees, a septic permit (if no public sewer), a well permit (if no public water), a driveway or curb-cut permit, and an HOA architectural review approval. Permit and fee requirements vary significantly by city, county, and state. The NAHB 2024 data shows site work costs (permits, impact fees, water/sewer fees, and architecture) averaging 7.6% of construction cost.
Prefab and modular homes can offer savings on construction costs because the home sections are built in a factory under controlled conditions, which reduces waste and weather delays. However, the total project cost (including land, site work, foundation, utility connections, and delivery) narrows the gap significantly. The overall savings depend heavily on your location, the specific manufacturer, and the complexity of the design. Modular homes must still meet local building codes and typically require the same permits and site infrastructure as site-built homes.
Yes. Every stage and sub-category in the estimator can be switched from "National average" to "Rate" (your own rate per square foot) or "Lump sum" (a total quote from a contractor or supplier). If you enter a lump-sum quote for an entire stage, the sub-category rows are overridden. If you enter quotes for individual sub-categories, those replace the national average for those items while the rest continue to use national averages. This lets you blend your own quotes with national averages for items you have not yet priced.
Use the "I have a budget" tab in the estimator. Enter your total budget, check whether it includes land, set your contingency and overhead percentages, and the calculator works backwards to show you the maximum buildable floor area. It also shows the area per floor for single-story, two-story, and three-story options, and checks whether the footprint fits your lot coverage limit if you enter those figures. If you have lump-sum quotes for specific items (like a custom kitchen), enter them first so the calculator can subtract them before sizing the house.
A two-story home shares one foundation and one roof across twice the floor area, which can make the cost per square foot lower than a single-story home of the same total area. However, two-story homes require stairs, potentially stronger framing, more scaffolding, and additional labor complexity. The NAHB does not publish separate cost-per-square-foot figures for single-story versus multi-story homes. Whether a two-story home is cheaper for your specific project depends on your lot, your builder, and local labor costs. The calculator includes an optional story cost adjustment field where you can enter the difference your builder quotes.
Building costs vary by state and even by city because of differences in labor costs, union versus non-union markets, local material availability and transportation costs, building code requirements (seismic, wind, energy efficiency), permit and impact fee schedules, land costs, and local market demand. The NAHB 2024 figures are national averages across all US regions. They are a useful planning benchmark but should not be used as a substitute for local contractor quotes.
A sunroom addition averages about $47,000, but a three-season room costs far less than a four-season one. How to choose, and why orientation decides its use.
A privacy fence only works if it blocks the right sightline. How to work out the height you need, what wood and vinyl cost per foot, and when plants do better.
Labor is 75% to 95% of an interior paint job, so prep and scope matter more than paint. How to measure walls, how many gallons you need, and painting safely.
A tiny house can cost $30,000 to $70,000 to build, but where you can live in it matters more. Wheels or foundation, the tiny house code and costs people miss.
6 min read
Know your number before you break ground.
Your inputs stay in your browser, so you can come back and refine the estimate as quotes arrive.